Stenton Gradba is a construction company known for leaving behind lasting value and delivering impactful projects. Every road, bridge, or structure is more than just a construction – it becomes part of someone's daily life, a catalyst for development, and a symbol of progress. This dedication to quality and innovation has positioned the company among the 200 most successful companies in Macedonia for 2023 – a recognition of its professionalism, reliability, and achievements in the construction sector.
Stenton Gradba successfully delivers infrastructure, commercial, and environmental projects that significantly contribute to economic growth and quality of life. The company is committed to developing projects that enhance both urban and rural environments, while ensuring safety, efficiency, and sustainable development.
Construction of Lidl Market – Bitola
As part of the expansion of the German retail brand Lidl, a modern, functional, and energy-efficient store was built in Bitola. This project not only provides a contemporary shopping experience but also creates new jobs and supports the local economy.
Rehabilitation of the Farish – Prilep (Pletvar) Road Section
The rehabilitation of this 19 km strategic road section has significantly improved traffic safety and functionality. As part of international corridor 10D, this route is used daily by thousands of vehicles, including heavy trucks. With the project's completion, better transport conditions and safer winter travel have been ensured.
Restoration of the Vardar Riverbed – Tudenec, Tetovo
The restoration and clearing of the Vardar Riverbed in Tudenec has significantly reduced the risk of flooding. Construction debris, waste, and vegetation obstructing the river's flow were removed, enhancing protection for homes and agricultural land in the area.
Landslide Stabilisation – Krushevo – Sladuevo
This terrain stabilisation project involved installing reinforced concrete piles, building a retaining structure, and applying modern engineering techniques to monitor deformations. The intervention improved road safety and prevented further erosion in the area.
Cleaning of the Crna Reka Riverbed
A 9 km section of the Crna Reka riverbed was cleared as part of this project, with over 180,000 m³ of alluvial deposits removed. This activity enhanced the river’s protective embankments and improved hydrological conditions in the region.

Stenton Gradba stands out for its use of advanced construction technologies and methodologies, with continuous investment in human capital and sustainable solutions. With every successfully completed project, the company reinforces its reputation as a trusted partner in the construction industry.
As one of Macedonia’s top-performing companies, Stenton Gradba continues to create new opportunities, set high standards, and contribute to a stronger infrastructure and improved quality of life.
05-12-2025
03-12-2025
03-12-2025
The State Statistical Office greets the efforts and dedication of Euro Business Center Skopje, as patron of the publication “200 Largest and most successful”, for promoting the success of the largest and most successful companies in Republic of Macedonia. Presenting official statistical data and the actual economy situation in Republic of Macedonia is of particular importance for the readers of the publication. It is a confirmation for the importance of the statistics in bringing decisions based on relevant, quality, accurate and on-time statistical data.
We use cookies to ensure that we give you the best experience on our website